CPT's Galgenweel in Antwerp

Galgenweel
The Galgenweel is the largest semi-natural brackish water lake in Flanders. The lake is approximately 40 hectares and located on the left bank in Antwerp. The lake was created by a dyke breach and is connected to the Zeeschelde by means of a lock, so it remains a brackish water lake. The depth varies from 2 to 15 meters and it has a bank length of 3500 meters. Especially in the summer months there is a lot of sailing and angling activity.

Cable wakeboarding
Cable wakeboarding is similar to wakeboarding behind a boat. The difference is that with cable wakeboarding you are pulled through a cable over the water. This cable is electrically driven and, depending on the level of the wakeboarder, speeds can be reached to above 30km / h.

New construction installation wakeboard cable and reception accommodation
A new wakeboard cable installation is being built with the corresponding reception accommodation. The construction consists of six masts, a wakeboard cable which is electrically driven by a tow lift (which produces only 53dB sound), a starting pontoon which can be reached via a walkway and the whole will be 402m long.
The reception accommodation will be equipped with a reception, various changing rooms, sanitary facilities, technical installations, storage rooms, a bar and a large terrace. In order not to lose sight of the environmentally friendly aspect, the exterior gets a green roof.

GSNED
GSNED has carried out geotechnical soil research on behalf of Eaglefish.
The work consisted of carrying 6 CPT's from a pontoon.
The water pressure was recorded during the probings, and the CPT's were carried out to a depth of 18 meters under the water bottom.

Related Projects

Water CPT's Kraayert harbor Flushing
CPTs Hillegersberg, Rotterdam
Marina Goes
Cycling underpass Sint-Lievenpoort in Ghent
Hollandse IJsselkering
70 meter deep CPT's for Sluishuis Amsterdam
Major Maintenance Waterways
3 bridges in the 'Schateiland' area in Almere City
Ledeganckkaai in Antwerp, Belgium
All Weather Terminal ArcelorMittal in Gent, Belgium
CPT's channel Gent-Terneuzen
DC Defensiedok Nieuwegein
Exeter Park Świebodzin, Poland
Nieuwe Sluis Terneuzen - termporary housing Oil trading company De Lege
DC Appelweg Moerdijk
Sluiswachter Terneuzen
Palm Paper King’s Lynn
Realization breakwaters Baalhoek and Knuitershoek
Dredging Rural area Goeree-Overflakkee - assignment part 2
CPT's Strand East, London
35 tons CPT's on water, Antwerp
Canal Dock B3 BASF Antwerp
Dredging rural area Goeree-Overflakkee
Dredging waterways
Gassco Emden Project

Marina Goes

GSNED BV has accepted the assignment from the Municipality of Goes to perform...