DC Defensiedok Nieuwegein

Business park "Het Klooster" in Nieuwegein is, with its central location in the Netherlands and the good road network around it, the ideal location for carrying out centralized logistics activities. The business park is located directly on the A27 highway with its own entrance and exit (28) directly to the site. The motorway connection to the A12 towards The Hague and Arnhem and the A2 towards Amsterdam and Eindhoven is at a very short distance. Heembouw is building a large-scale and sustainable 28,000 m² distribution center at the Klooster in Nieuwegein business park.

GSNED / BMNED
GSNED has performed 148 tests with measurement of cone resistance and local adhesion. In addition, 8 more probes with additional measurements of water pressure. All these soundings have been continued to an average of almost 25 meters minus ground level.
BMNED has drawn up a foundation recommendation based on these tests.

Related Projects

Water CPT's Kraayert harbor Flushing
CPTs Hillegersberg, Rotterdam
Marina Goes
Cycling underpass Sint-Lievenpoort in Ghent
Hollandse IJsselkering
70 meter deep CPT's for Sluishuis Amsterdam
Major Maintenance Waterways
3 bridges in the 'Schateiland' area in Almere City
Ledeganckkaai in Antwerp, Belgium
All Weather Terminal ArcelorMittal in Gent, Belgium
CPT's channel Gent-Terneuzen
Exeter Park Świebodzin, Poland
Nieuwe Sluis Terneuzen - termporary housing Oil trading company De Lege
DC Appelweg Moerdijk
Sluiswachter Terneuzen
CPT's Galgenweel in Antwerp
Palm Paper King’s Lynn
Realization breakwaters Baalhoek and Knuitershoek
Dredging Rural area Goeree-Overflakkee - assignment part 2
CPT's Strand East, London
35 tons CPT's on water, Antwerp
Canal Dock B3 BASF Antwerp
Dredging rural area Goeree-Overflakkee
Dredging waterways
Gassco Emden Project

Marina Goes

GSNED BV has accepted the assignment from the Municipality of Goes to perform...