Cycling underpass Sint-Lievenpoort in Ghent

GSNED has accepted the assignment from Artes Depret nv from Zeebrugge to carry out additional geotechnical soil investigation for the project "Cycling underpass Sint-Lievenpoort (R40 Sint-Lievenslaan) in Ghent". For this, 2 verification CPTs were carried out with the measurement of cone resistance and local adhesive. These inspections had to be carried out on the water under an existing bridge, which made the movement space extra tight and the challenge extra high. We used pontoons with a crawler crane and mounted our 20-ton CPT platform on it. Through casing tubes, which we placed next to the piles, we could be sure that the CPT rods would not bend.

Facts & Figures

  • GSNED
  • Artes Depret nv

Related Projects

Water CPT's Kraayert harbor Flushing
CPTs Hillegersberg, Rotterdam
Marina Goes
Hollandse IJsselkering
70 meter deep CPT's for Sluishuis Amsterdam
Major Maintenance Waterways
3 bridges in the 'Schateiland' area in Almere City
Ledeganckkaai in Antwerp, Belgium
All Weather Terminal ArcelorMittal in Gent, Belgium
CPT's channel Gent-Terneuzen
DC Defensiedok Nieuwegein
Exeter Park Świebodzin, Poland
Nieuwe Sluis Terneuzen - termporary housing Oil trading company De Lege
DC Appelweg Moerdijk
Sluiswachter Terneuzen
CPT's Galgenweel in Antwerp
Palm Paper King’s Lynn
Realization breakwaters Baalhoek and Knuitershoek
Dredging Rural area Goeree-Overflakkee - assignment part 2
CPT's Strand East, London
35 tons CPT's on water, Antwerp
Canal Dock B3 BASF Antwerp
Dredging rural area Goeree-Overflakkee
Dredging waterways
Gassco Emden Project

Marina Goes

GSNED BV has accepted the assignment from the Municipality of Goes to perform...